Sewage Treatment Plant & Biological Waste Water Treatment Services
Sewage Treatment Plant & Biological Waste Water Treatment Services

Centocor Biopharma
- Cork, Ireland

  • Client: Centocor Biologics, Ireland (part of J&J group)
  • Size on BOD: 15,000 Population Equivalent
  • Final Quality:
    • BOD5 ≤ 5mg/l
    • TSS ≤ 5 mg/l
    • Total N ≤ 15 mg/l
    • PO-P4 ≤ 1 mg/l
  • Scope: DBO contract
  • Process:
    • Inlet balancing tanks with emergency dump facility, a full pH correctionsystem and temperature control facility incorporated
    • Nitrification-denitrification, activated sludge reactors, MBR plant (with necessary carbon and nutrient dosing stations)
    • Sludge plant (thickening, holding and chamber press installation with sludge cake stabilization)
    • Full Odour Control facilities
         
  • Dates:
    • DB phase - 2005-2006
    • O&M contract - ongoing